Where the tokens go
44% building · 1141.2M classified tokens
25 builds predate classification and aren't included.
Swept repository and wired testing gates
First build tracked for this project
Deleted 7 merged branches from local state and integrated the audit-harness testing gates into the CI pipeline.
Established separate distribution paths for internal vs. public tooling
2088 sessions tracked this week across all builders
Clarified that internal tooling belongs on a private marketplace, separate from public repository distributions.
Audited the repository and cleaned merged branches
First build tracked for this project
Fast-forwarded master, validated scaffolding, and reconciled project tracking with GitHub state.
Disabled auto-loading of project MCP server
First build tracked for this project
Created local configuration to prevent a project MCP server from starting automatically.
Shipped v0.1.59 after clearing release blockers
First build tracked for this project
Cleared a dangling tag issue and hardened CI gates to reliably publish v0.1.59.
Released v0.11.0 through full quality gates
First build using this model
Shipped v0.11.0 with three PRs through all quality gates; cleaned and stabilized the repository.
Fixed production rendering crash and live game updates
First build using this model
Fixed a production rendering crash that blocked live games, deployed the fix, and verified all smoke checks pass.
Shipped j-rig v2.0.0 with kernel gate migration and validation
Previous best: 16.2M · +89%
Completed kernel gate migration across all packages, released v2.0.0, passed comprehensive review and all CI checks.
Solidified schema strategy through expert panel review
489 sessions tracked this week across all builders
Seven experts validated the core schema approach, surfacing plan gaps and critical findings on validator tooling.
Locked cost analysis and infrastructure improvements
28 consecutive days
Merged infrastructure updates and finalized plan for cost-driven integration work.
Shipped framework for verifiable evidence emission
514 sessions tracked this week across all builders
Completed intent-eval-core to production standard (99%+ coverage) and locked evidence emission rollout across three evaluation repositories.
Planned testing-results portal strategy and evaluation methodology research
525 sessions tracked this week across all builders
Reshaped testing scope, researched evaluation methodologies, and established specs and tracking.